Our production line needed some crushers. We always bought some of European equipment in the past. We investigated SBM this time and found their technology was not worse than the European technology and the price was much lower than that of European equipment.
I knew SBM through a friend. SBM salesman was very enthusiastic and patient when making production scheme for me. After investigating SBM's factories and sample production lines personally, I found that SBM is very professional.
On site, only the road surface requires leveling and compacting to establish working conditions, eliminating the necessity for cement foundation leveling and hardening. This significantly reduces the project's construction material costs.
The iron ore is evenly fed by TSW1139 feeder into HJ98 high-efficiency jaw crusher for coarse crushing. After that, the materials would be sent into CS160 cone crusher for secondary crushing.
— Quality Assurance/Quality Control QA/QC requirements and the test results generated through the requirements have been the catalysts to the development of many innovations and improved practices
— Bored pile with m diameter and 70 m depth was chosen There is 3 major structure main pylon counterweight and abutment as shown in Fig 1 This paper will cover the pile test in pylon foundation It was designed to have about 1350 tons ultimate capacity Bi directional load test chose to check the pile performance at pylon foundation
— To test the load a minimum load applied during the test will be equal to times the working load So it is important to identify the working load of the pile into consideration Scheme of Static Pile Load Test Set up Pile Integrity Test The integrity test is an essential part of quality control in either cast in place or pre cast concrete
— Pile load testing is considered to be a direct method for pile load testing that satisfies the structural and geotechnical requirements of a foundation to perform safely AbstractFor a foundation to perform safely the ultimate strength of each pile must satisfy the structural and geotechnical requirements Pile load testing is considered to be a direct
— Pile load testing is considered to be a direct method for pile load testing that satisfies the structural and geotechnical requirements of a foundation to perform safely AbstractFor a foundation to perform safely the ultimate strength of each pile must satisfy the structural and geotechnical requirements Pile load testing is considered to be a direct
A 3 × 3 bored pile group consisting of nine cast in drilled hole reinforced concrete shafts and a comparable single shaft were subjected to reversed cyclic lateral head loading to investigate group interaction effects across a wide range of lateral displacements The piles had the same diameter of d = m and similar soil conditions; however various
— Tubular or combined piles were traditionally used as vertical soil support for deep excavations A wide range of calculation methods were developed for this lateral direction of acting forces
Method statement of bored piles is a construction procedure that includes hole boring into the ground installing steel reinforcement and casting with concrete to form a pile etc Bored piles are constructed in the ground by boring in the circular shape of designed diameters to transfer load from the superstructure into the ground through friction and end bearing
— Procedure for Pile Integrity Test PIT For square piles less commonly tested testing point shall be at the middle of the pile with the hammer impact preferably approximately ¼ d away from the accelerometer as shown below For piles with hollow annulus Spun Piles testing point shall be at three equally spaced
— test check bell out test check honeycomb void and cracks test check concrete OK or 4 rock head RCD rock socket Rock socket m 4a&nb
— requirements for reinforced concrete in piles bored cast in situ piles driven piles steel piles bakau piling indigenous timber piles pile load testing integrity tests appendix appendix engineering group document e/gd/09/104/a2 m&w for civil & structural works mw / 0 / 8 sep 2020
— Bored piles in granular soils 93 Driven piles in granular soils 97 Bored piles in clays 98 Driven piles in clays 99 Other factors affecting shaft resistance 100 Effect of soil plug on open ended pipe piles 100 Correlation with Standard Penetration Tests 101 General 101
1 — 6 Pile foundations COMMENTARY ON Clause 6 This clause applies to the design and construction of bored cast in place concrete piles; driven cast in place concrete piles; prefabricated piles made of concrete steel cast iron or timber; micropiles; helical steel piles; piled underpinning; pile groups Choice and design of pile foundations
A power plant is being founded on bored concrete piles which penetrate 30 40 m of compressible soil and are socketed into rock a correlation with concrete compressive strength as measured by core crushing was identified Finally the use of multiple pipes cast into piles has been shown to be an effective way to test piles without coring
— Every driven pile has some sort of test drive blows But this does not work for bored or drilled piles as there is no feedback from installation 15 Geotechnical Design to EC7 by crushing compression Structural failure tension Structural failure in
— This paper is concerned with the use of polymer fluids for the construction of bored piles in silty fine sand a situation which has been found to significantly increase the risk of soft toes and concrete contamination due to the settling of the suspended soil particles in the fluid To illustrate how these problems can be avoided by adopting a
— 2 SE SA5A 9/2020 d Test on bearing strata Test to verify the uniaxial compressive strength UCS or equivalent point lo ad index strength PLI 50 of the founding material for piles socketed in Cat 1 c or better rock should be carried out The number of tests
4 — The purpose of this document is to outline the proposed methodology for the construction of the cast in situ bored piles using temporary Aim of the procedure is to detail the sequence and method of pile construction identify the hazard assess the associated risks involved develop and implement adequate control measures and to
— The positions of piles shall be verified by a Licensed Surveyor Tolerances a Position The pile heads shall be positioned as shown on the Drawings within a maximum deviation of 75mm in either direction from its design position b Verticality For bored cast in situ piles the maximum permitted deviation of the finished
— Small Diameter Bored Piles Large Diameter Bored Mini Piles Barrettes Dynamic Load Test for Driven Piles Tension Loading Test Lateral Load Test
A five pile test group four anchor piles and one test pile is used for all static load tests in compression and for most tension tests Figure 8 1 Occasionally a three pile test group two anchor piles and one test pile is used for static load tests in tension refer to Appendix F Pile Dynamic Analysis Static Pile Load Testing and Field
— Pile load testing is considered to be a direct method for pile load testing that satisfies the structural and geotechnical requirements of a foundation to perform safely AbstractFor a foundation to perform safely the ultimate strength of each pile must satisfy the structural and geotechnical requirements Pile load testing is considered to be a direct
— test check bell out test check honeycomb void and cracks test check concrete OK or 4 rock head RCD rock socket Rock socket m 4a&nb
— 2 A b = Pile base area F s = Partial Factor of Safety for Shaft Resistance = F b = Partial Factor of Safety for Base Resistance > F g = Global Factor of Safety for Total Resistance Base Shaft = In general the contribution of base resistance in bored piles shall be ignored due to difficulty of proper base cleaning especially in wet hole with
— Comparisons of RLT results with equivalent static tests for bored piles embedded in various ground conditions are compiled and presented From the aspects of load displacement behavior RLT appears to result in practically identical settlements compared to equivalent static test at similar static loads when the pile settlements were
— The construction of diaphragm walls and most large diameter bored piles piers is often carried out under drilling support fluids to temporarily stabilize the excavation prior to concrete placement
— introduced in this part of the standard to cover the provisions of bored precast concrete piles The portion relating to load test on piles has been covered in a separate part namely IS 2911 Part 4 1984 Code of practice for design and construction of pile foundations Part 4 Load test on piles Accordingly IS 2911 has